ITAC Assessment: GT0721
ITAC logo
ITAC Assessment: GT0721
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Printed Folding Cartons
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 300,000
ft2
Annual Production 56,400,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $306,184 13,578,023
kWh
Electricity Demand $317,538 26,295
kW-mo/yr
Electricity Fees $69,023 -
Natural Gas $119,556 9,924
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $912,215 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $12,360 $5,050 n/a $(-286.0)
(-11,444)
kWh
$(-19.0) $12,665
-
MMBtu
- -
02 2.8113: Purchase gas directly from a contract gas supplier $25,375 - n/a - - - - $25,375
03 2.1321: Replace fossil fuel equipment with electrical equipment $38,845 $80,000 n/a $(-2,605.0)
(-104,195)
kWh
$(-183.0) $41,633
-
MMBtu
- -
04 2.7224: Reduce space conditioning during non-working hours $705 $60 n/a - - $705
-
MMBtu
- -
05 2.4239: Eliminate or reduce compressed air usage $28,530 $15,000 n/a $26,664
938,888
kWh
$1,866 - - -
06 4.446: Automate finishing process $806,400 $3,500,000 n/a - - - $806,400 -
TOTAL RECOMMENDED $912,215 $3,600,110 $23,773
823,249
kWh
$1,664 $55,003
-
MMBtu
$806,400 $25,375
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs