| Assessment Year | 1986 |
|---|---|
| Principal Product | PROCESSED PACKAGED BEEF |
| NAICS |
n/a
|
| SIC | 2011: Meat Packing Plants |
| Sales Range | $100 M to 500M |
| # of Employees | 450 |
| Plant Area |
n/a
|
| Annual Production | 269,000
lb
|
| Production Hrs. Annual | 4,290
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $308,051 | 10,221,864 |
kWh
|
$0.030 |
| Natural Gas | $333,310 | 63,021 |
MMBtu
|
$5.29 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $54,261 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,094 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,174 | $300 | - |
$3,174
-
MMBtu
|
|
| 02 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $5,704 | $2,100 |
$5,704
189,332
kWh
|
- | |
| 03 | 2.2441: Preheat boiler makeup water with waste process heat | $21,545 | $30,000 | - |
$21,545
-
MMBtu
|
|
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,571 | $1,200 |
$4,571
151,817
kWh
|
- | |
| 05 | 2.4312: Improve lubrication practices | $8,280 | - |
$8,280
274,912
kWh
|
- | |
| 06 | 2.2414: Use waste heat from hot flue gases to preheat | $5,622 | $6,000 | - |
$5,622
-
MMBtu
|
|
| 07 | 2.7226: Use computer programs to optimize hvac performance | $1,913 | - |
$1,913
63,599
kWh
|
- | |
| 08 | 2.4239: Eliminate or reduce compressed air usage | $2,273 | $200 |
$2,273
75,322
kWh
|
- | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $479 | $500 |
$479
15,826
kWh
|
- | |
| 10 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $339 | $750 | - |
$339
-
MMBtu
|
|
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $361 | $527 |
$361
12,016
kWh
|
- | |
| TOTAL RECOMMENDED | $54,261 | $41,577 |
$23,581
782,824
kWh
|
$30,680
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $27,094 | $5,577 |
$23,581
782,824
kWh
|
$3,513
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs