ITAC Assessment: GT0719
ITAC logo
ITAC Assessment: GT0719
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Glass Bottles
NAICS
n/a
SIC 3221: Glass Containers
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 184,000
ft2
Annual Production 122,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $313,069 17,519,226
kWh
Electricity Demand $219,425 29,616
kW-mo/yr
Electricity Fees $108,747 -
Natural Gas $790,503 157,495
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $176,552 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings
01 2.2424: Use heat in flue gases to preheat products or materials $80,000 $125,000 n/a $(-400.0)
(-22,380)
kWh
- $(-30.0) $84,340
-
MMBtu
- $(-3,910.0) - -
02 4.123: Reduce defects by reducing product tipping $18,750 $1,500 n/a - - - - - - - $18,750
03 3.4114: Replace city water with recycled water via cooling tower $44,105 $12,500 n/a $(-675.0)
(-37,800)
kWh
- - - $24,028
-
Tgal
$(-1,300.0) $22,052
-
Tgal
-
04 3.4116: Meter recycled water (to reduce sewer charges) $30,490 $8,220 n/a - - - - $30,490
-
Tgal
- - -
05 2.7261: Install timers and/or thermostats $467 $400 n/a $437
24,446
kWh
- $30 - - - - -
06 2.7111: Reduce illumination to minimum necessary levels $2,740 $900 n/a $2,204
123,331
kWh
$356
-
kW-mo/yr
$180 - - - - -
TOTAL RECOMMENDED $176,552 $148,520 $1,566
87,597
kWh
$356
-
kW-mo/yr
$180 $84,340
-
MMBtu
$54,518
-
Tgal
$(-5,210.0) $22,052
-
Tgal
$18,750
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs