ITAC Assessment: GT0718
ITAC logo
ITAC Assessment: GT0718
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Tire Retread
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 126,000
ft2
Annual Production 700,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $453,167 18,602,914
kWh
Electricity Demand $403,241 35,372
kW-mo/yr
Electricity Fees $83,547 -
Natural Gas $637,755 74,993
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $239,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,000 - n/a - - $20,000 $(-6,000.0) -
02 2.8112: Combine utility meters $2,360 - n/a - - - - $2,360
03 2.4235: Remove or close off unneeded compressed air lines $645 - n/a $610
25,032
kWh
- $35 - -
04 2.4224: Upgrade controls on compressors $1,625 $7,000 n/a $1,536
63,040
kWh
- $89 - -
05 2.1114: Limit and control secondary combustion air in furnace $35,705 $3,500 n/a - - $35,705 - -
06 4.445: Install equipment to move product $99,000 $80,000 n/a - - - $99,000 -
07 2.2426: Use waste heat from flue gases to heat space conditioning air $12,400 $30,000 n/a - - $12,400 - -
08 3.8131: Use water-based adhesives $73,300 $20,000 n/a $1,604
65,856
kWh
$1,532
-
kW-mo/yr
$70,164 - -
09 2.8112: Combine utility meters $127 - n/a - - - - $127
TOTAL RECOMMENDED $239,162 $140,500 $3,750
153,928
kWh
$1,532
-
kW-mo/yr
$138,393 $93,000 $2,487
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs