ITAC Assessment: TN0678
ITAC logo
ITAC Assessment: TN0678
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Nursing uniforms, rags
NAICS
n/a
SIC 2326: Men's and Boys' Work Clothing
Sales Range $1
M
to 5
M
# of Employees 210
Plant Area 66,000
ft2
Annual Production 13,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,699 1,913,834
kWh
Electricity Demand $41,797 4,833
kW-mo/yr
Electricity Fees $5,468 -
Fuel Oil #2 $11,933 3,144
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $589,337 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,097

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings By-product Production Savings Increase in Production Savings
01 2.6225: Eliminate third shift $487,140 $47,600 - - $14,340
-
MMBtu
$2,800
-
MMBtu
- - - - $470,000
02 4.445: Install equipment to move product $41,280 $99,240 - - - - - $41,280 - - -
03 3.2176: Increase use of automation $32,000 $52,200 - - - - - $32,000 - - -
04 2.7144: Install spectral reflectors / delamp $12,340 $8,780 $11,840
263,189
kWh
- - - - - $500 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,470 $695 $4,670
103,751
kWh
$3,800
-
kW-mo/yr
- - - - - - -
06 3.1182: Make a new by-product $6,160 - - - - - $5,000
-
lb
- - $1,160 -
07 2.7131: Add area lighting switches $1,320 $2,660 $1,320
19,050
kWh
- - - - - - - -
08 2.2162: Reduce excess steam bleeding $350 $170 $350
11,430
kWh
- - - - - - - -
09 2.2136: Install / repair insulation on steam lines $277 - $277
14,068
kWh
- - - - - - - -
TOTAL RECOMMENDED $589,337 $211,345 $18,457
411,488
kWh
$3,800
-
kW-mo/yr
$14,340
-
MMBtu
$2,800
-
MMBtu
$5,000
-
lb
$73,280 $500 $1,160 $470,000
TOTAL IMPLEMENTED $9,097 $865 $5,297
129,249
kWh
$3,800
-
kW-mo/yr
- - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings By-product Production Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs