Assessment Year | 2001 |
---|---|
Principal Product | Machined Components |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 185 |
Plant Area |
210,000
ft2
|
Annual Production | 20,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $208,912 | 10,604,693 |
kWh
|
$0.020 |
Electricity Demand | $250,227 | 23,020 |
kW-mo/yr
|
$10.87 |
Electricity Fees | $44,811 | - |
|
- |
Natural Gas | $31,936 | 3,381 |
MMBtu
|
$9.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $71,625 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,160 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,765 | $16,300 |
$3,362
170,703
kWh
|
$4,403
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,700 | $10,500 |
$1,420
72,000
kWh
|
$1,280
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.2514: Cover open tanks | $17,390 | $4,510 | - | - |
$17,390
-
MMBtu
|
- | - | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,475 | $4,275 |
$15,720
798,000
kWh
|
$21,625
-
kW-mo/yr
|
$(-33,870.0)
-
MMBtu
|
- | - | - | - | |
05 | 2.8114: Change rate schedules or other changes in utility service | $18,600 | - | - | - | - | - | $18,600 | - | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $7,465 | $67,250 |
$1,436
72,940
kWh
|
- |
$6,029
-
MMBtu
|
- | - | - | - | |
07 | 3.5111: Filter and reuse hydraulic oil | $1,030 | $1,000 | - | - | - |
$2,355
-
gal
|
- | $(-1,325.0) | - | |
08 | 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid | $6,000 | $25,180 | - | - | - |
$6,000
-
gal
|
- | - | - | |
09 | 4.651: Install back-up equipment | $7,200 | $29,314 | - | - | - | - | $4,320 | - | $2,880 | |
TOTAL RECOMMENDED | $71,625 | $158,329 |
$21,938
1,113,643
kWh
|
$27,308
-
kW-mo/yr
|
$(-10,451.0)
-
MMBtu
|
$8,355
-
gal
|
$22,920 | $(-1,325.0) | $2,880 | ||
TOTAL IMPLEMENTED | $32,160 | $149,544 |
$6,218
315,643
kWh
|
$5,683
-
kW-mo/yr
|
$6,029
-
MMBtu
|
$8,355
-
gal
|
$4,320 | $(-1,325.0) | $2,880 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs