ITAC Assessment: GT0717
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Machined Components
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 210,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,912 10,604,693
kWh
Electricity Demand $250,227 23,020
kW-mo/yr
Electricity Fees $44,811 -
Natural Gas $31,936 3,381
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,625 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,765 $16,300 $3,362
170,703
kWh
$4,403
-
kW-mo/yr
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,700 $10,500 $1,420
72,000
kWh
$1,280
-
kW-mo/yr
- - - - -
03 2.2514: Cover open tanks $17,390 $4,510 - - $17,390
-
MMBtu
- - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,475 $4,275 $15,720
798,000
kWh
$21,625
-
kW-mo/yr
$(-33,870.0)
-
MMBtu
- - - -
05 2.8114: Change rate schedules or other changes in utility service $18,600 - - - - - $18,600 - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $7,465 $67,250 $1,436
72,940
kWh
- $6,029
-
MMBtu
- - - -
07 3.5111: Filter and reuse hydraulic oil $1,030 $1,000 - - - $2,355
-
gal
- $(-1,325.0) -
08 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $6,000 $25,180 - - - $6,000
-
gal
- - -
09 4.651: Install back-up equipment $7,200 $29,314 - - - - $4,320 - $2,880
TOTAL RECOMMENDED $71,625 $158,329 $21,938
1,113,643
kWh
$27,308
-
kW-mo/yr
$(-10,451.0)
-
MMBtu
$8,355
-
gal
$22,920 $(-1,325.0) $2,880
TOTAL IMPLEMENTED $32,160 $149,544 $6,218
315,643
kWh
$5,683
-
kW-mo/yr
$6,029
-
MMBtu
$8,355
-
gal
$4,320 $(-1,325.0) $2,880
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs