Assessment Year | 2001 |
---|---|
Principal Product | Aluminum Door/Window Frames |
NAICS |
n/a
|
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $10 M to 50M |
# of Employees | 380 |
Plant Area |
235,000
ft2
|
Annual Production | 13,200,000
lb
|
Production Hrs. Annual | 7,224
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $503,214 | 12,376,578 |
kWh
|
$0.041 |
Electricity Fees | $35,225 | - |
|
- |
Natural Gas | $173,283 | 38,530 |
MMBtu
|
$4.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $651,051 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $3,318 | $500 |
$3,087
120,307
kWh
|
$231 | - | - | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,200 | $250 |
$2,056
58,850
kWh
|
$144 | - | - | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,340 | $1,150 |
$4,056
115,920
kWh
|
$284 | - | - | - | - | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $2,241 | $850 |
$2,094
81,542
kWh
|
$147 | - | - | - | - | - | |
05 | 2.3137: Use power during off-peak periods | $30,130 | - | - | $30,130 | - | - | - | - | - | |
06 | 4.424: Improve space comfort conditioning | $205,424 | $21,200 |
$(-4,104.0)
(-70,272)
kWh
|
$(-287.0) | - | - | $210,815 | - |
$(-1,000.0)
-
Tgal
|
|
07 | 2.1113: Reduce combustion air flow to optimum | $2,125 | $1,000 | - | - |
$2,125
-
MMBtu
|
- | - | - | - | |
08 | 2.1113: Reduce combustion air flow to optimum | $2,850 | $2,000 | - | - |
$2,850
-
MMBtu
|
- | - | - | - | |
09 | 3.5313: Increase amount of waste recovered for resale | $360,000 | $1,600,000 | - | $(-202,500.0) | - |
$562,500
-
gal
|
- | - | - | |
10 | 3.4155: Meter waste water | $8,955 | $6,500 | - | - | - | - | - | $8,955 | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,468 | $29,375 |
$27,540
787,500
kWh
|
$1,928 | - | - | - | - | - | |
TOTAL RECOMMENDED | $651,051 | $1,662,825 |
$34,729
1,093,847
kWh
|
$(-169,923.0) |
$4,975
-
MMBtu
|
$562,500
-
gal
|
$210,815 | $8,955 |
$(-1,000.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs