ITAC Assessment: GT0699
ITAC logo
ITAC Assessment: GT0699
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Poultry
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $50
M
to 100
M
# of Employees 420
Plant Area 250,000
ft2
Annual Production 27,000,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $587,649 9,033,119
kWh
Electricity Demand $105,464 19,337
kW-mo/yr
Electricity Fees $86,083 -
LPG $825,000 138,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $352,413 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Personnel Changes Savings
01 4.452: Eliminate shift $244,498 - n/a $448
9,672
kWh
- - $28,050
-
MMBtu
$216,000
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $20,694 - n/a $15,235
347,304
kWh
$4,284
-
kW-mo/yr
$1,175 - -
03 2.2522: Isolate hot or cold equipment $37,855 - n/a - - - $37,855
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $8,198 $1,000 n/a - - - $8,198
-
MMBtu
-
05 2.2511: Insulate bare equipment $5,763 $3,000 n/a - - - $5,763
-
MMBtu
-
06 3.4151: Minimize water usage $680 $600 n/a $680
14,654
kWh
- - - -
07 3.4156: Use flow control valves on equipment to optimize water use $883 $9,000 n/a $833
19,050
kWh
- $50 - -
08 3.4156: Use flow control valves on equipment to optimize water use $505 $900 n/a $476
10,844
kWh
- $29 - -
09 2.6231: Utilize controls to operate equipment only when needed $11,182 $31,500 n/a $421
9,086
kWh
- - $10,761
-
MMBtu
-
10 2.8112: Combine utility meters $21,948 - n/a - - $21,948 - -
11 3.4151: Minimize water usage $207 $205 n/a $207
4,689
kWh
- - - -
TOTAL RECOMMENDED $352,413 $46,205 $18,300
415,299
kWh
$4,284
-
kW-mo/yr
$23,202 $90,627
-
MMBtu
$216,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs