ITAC Assessment: GT0678
ITAC logo
ITAC Assessment: GT0678
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Recreational Vehicles
NAICS
n/a
SIC 3799: Transportation Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 900
Plant Area 365,000
ft2
Annual Production 9,600
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $600,786 19,921,454
kWh
Electricity Demand $256,771 19,162
kW-mo/yr
Electricity Fees $51,450 -
Natural Gas $377,914 73,327
MMBtu
LPG $36,521 8,504
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $112,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,905

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Water Disposal Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
01 3.4155: Meter waste water $4,925 $900 - - - $4,925
-
Tgal
- -
02 2.1241: Reduce excessive boiler blowdown $920 $900 - $920
-
MMBtu
- - - -
03 2.4221: Install compressor air intakes in coolest locations $4,880 $3,500 $4,880
139,508
kWh
- - - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,400 - $5,400
154,162
kWh
- - - - -
05 2.4322: Use or replace with energy efficient substitutes $8,447 $21,000 - $(-23,548.0)
-
MMBtu
$31,995
-
MMBtu
- - -
06 3.5142: Treat and reuse equipment cleaning solutions $35,980 - - - - - $35,980
-
gal
-
07 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $44,185 $120,000 $8,317
237,691
kWh
$35,868
-
MMBtu
- - - -
08 2.8112: Combine utility meters $7,560 $7,500 - - - - - $7,560
TOTAL RECOMMENDED $112,297 $153,800 $18,597
531,361
kWh
$13,240
-
MMBtu
$31,995
-
MMBtu
$4,925
-
Tgal
$35,980
-
gal
$7,560
TOTAL IMPLEMENTED $40,905 $900 - - - $4,925
-
Tgal
$35,980
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings Water Disposal Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs