ITAC Assessment: UU0245
ITAC logo
ITAC Assessment: UU0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product NA
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 100
Plant Area 130,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,188
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,730 1,053,279
kWh
Natural Gas $48,420 8,070
MMBtu
TOTAL YEARLY COSTS $122,150
RECOMMENDED SAVINGS* $22,467 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,774

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $13,514 $18,000 $(-3,508.0)
(-50,112)
kWh
$17,022
-
MMBtu
02 2.7243: Improve air circulation with destratification fans / other methods $5,693 $25,330 $1,733
24,760
kWh
$3,960
-
MMBtu
03 2.7224: Reduce space conditioning during non-working hours $2,961 $3,200 $2,961
40,360
kWh
-
04 2.7221: Lower temperature during the winter season and vice-versa $299 $100 - $299
-
MMBtu
TOTAL RECOMMENDED $22,467 $46,630 $1,186
15,008
kWh
$21,281
-
MMBtu
TOTAL IMPLEMENTED $16,774 $21,300 $(-547.0)
(-9,752)
kWh
$17,321
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs