ITAC Assessment: GT0660
ITAC logo
ITAC Assessment: GT0660
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Fluorescent Lights
NAICS
n/a
SIC 3645: Residential Electric Lighting Fixtures
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 123,800
ft2
Annual Production 310,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,653 1,646,835
kWh
Electricity Fees $7,510 -
LPG $4,268 741
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $202,741 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $169,625

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.8112: Combine utility meters $2,900 - - - - - - $2,900 - -
02 2.4226: Use / purchase optimum sized compressor $9,800 $10,000 $9,245
142,438
kWh
$555 - - - - - -
03 2.7132: Install timers on light switches in little used areas $18,000 $500 $16,980
261,137
kWh
$1,020 - - - - - -
04 2.7111: Reduce illumination to minimum necessary levels $2,000 $1,280 $1,885
29,015
kWh
$115 - - - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,150 $1,000 $4,860
74,736
kWh
$290 - - - - - -
06 3.5316: Contract a wood pallet recycling company $2,900 - - - - $2,900
-
lb
- - - -
07 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $416 $1,000 - - $290
-
gal
- - - $126 -
08 4.653: Maintain/enlarge a stock of spare parts $161,575 $300,000 - - - - $1,875 - $16,500 $143,200
TOTAL RECOMMENDED $202,741 $313,780 $32,970
507,326
kWh
$1,980 $290
-
gal
$2,900
-
lb
$1,875 $2,900 $16,626 $143,200
TOTAL IMPLEMENTED $169,625 $301,000 $4,860
74,736
kWh
$290 - $2,900
-
lb
$1,875 - $16,500 $143,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs