*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Aircaft Parts
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range n/a
# of Employees 440
Plant Area 181,890
ft2
Annual Production 12
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,945 6,185,815
kWh
Electricity Demand $95,256 6,000
kW-mo/yr
Electricity Fees $5,455 -
Natural Gas $128,054 21,270
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $277,779 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Solid Waste (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.8113: Purchase gas directly from a contract gas supplier $53,008 $75,650 n/a - - - - $(-5,108.0)
-
MMBtu
- $58,116 - - -
02 2.3191: Use demand controller or load shedder $12,270 $5,000 n/a $11,467
60,961
kWh
- $803 - - - - - - -
03 3.4155: Meter waste water $2,793 $200 n/a - - - - - - $2,793 - - -
04 3.2121: Convert to electrostatic powder coating $23,418 $1,000 n/a - - - - - $2,400
-
lb
$19,718 $1,300 - -
05 2.4239: Eliminate or reduce compressed air usage $2,997 $160 n/a $2,801
87,925
kWh
- $196 - - - - - - -
06 2.7132: Install timers on light switches in little used areas $1,779 $400 n/a $979
29,894
kWh
$684
-
kW-mo/yr
$116 - - - - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $8,617 $25,504 n/a $3,901
121,923
kWh
$4,152
-
kW-mo/yr
$564 - - - - - - -
08 4.111: Add equipment/ operators to reduce production bottleneck $94,225 $35,250 n/a $8,467
264,654
kWh
- $593 $49,165
-
MMBtu
- - - - - $36,000
09 3.7131: Use a rag recycle service $65,262 - n/a - - - - - $60,462
-
lb
- $4,800 - -
10 2.4226: Use / purchase optimum sized compressor $13,410 $2,400 n/a $4,224
131,887
kWh
$3,636
-
kW-mo/yr
$550 - - - - - $5,000 -
TOTAL RECOMMENDED $277,779 $145,564 $31,839
697,244
kWh
$8,472
-
kW-mo/yr
$2,822 $49,165
-
MMBtu
$(-5,108.0)
-
MMBtu
$62,862
-
lb
$80,627 $6,100 $5,000 $36,000
TOTAL IMPLEMENTED - - - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Solid Waste (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs