Assessment Year | 1999 |
---|---|
Principal Product | Aircaft Parts |
NAICS |
n/a
|
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | n/a |
# of Employees | 440 |
Plant Area |
181,890
ft2
|
Annual Production | 12
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $197,945 | 6,185,815 |
kWh
|
$0.032 |
Electricity Demand | $95,256 | 6,000 |
kW-mo/yr
|
$15.88 |
Electricity Fees | $5,455 | - |
|
- |
Natural Gas | $128,054 | 21,270 |
MMBtu
|
$6.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $277,779 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | LPG Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $53,008 | $75,650 | n/a | - | - | - | - |
$(-5,108.0)
-
MMBtu
|
- | $58,116 | - | - | - |
02 | 2.3191: Use demand controller or load shedder | $12,270 | $5,000 | n/a |
$11,467
60,961
kWh
|
- | $803 | - | - | - | - | - | - | - |
03 | 3.4155: Meter waste water | $2,793 | $200 | n/a | - | - | - | - | - | - | $2,793 | - | - | - |
04 | 3.2121: Convert to electrostatic powder coating | $23,418 | $1,000 | n/a | - | - | - | - | - |
$2,400
-
lb
|
$19,718 | $1,300 | - | - |
05 | 2.4239: Eliminate or reduce compressed air usage | $2,997 | $160 | n/a |
$2,801
87,925
kWh
|
- | $196 | - | - | - | - | - | - | - |
06 | 2.7132: Install timers on light switches in little used areas | $1,779 | $400 | n/a |
$979
29,894
kWh
|
$684
-
kW-mo/yr
|
$116 | - | - | - | - | - | - | - |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,617 | $25,504 | n/a |
$3,901
121,923
kWh
|
$4,152
-
kW-mo/yr
|
$564 | - | - | - | - | - | - | - |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $94,225 | $35,250 | n/a |
$8,467
264,654
kWh
|
- | $593 |
$49,165
-
MMBtu
|
- | - | - | - | - | $36,000 |
09 | 3.7131: Use a rag recycle service | $65,262 | - | n/a | - | - | - | - | - |
$60,462
-
lb
|
- | $4,800 | - | - |
10 | 2.4226: Use / purchase optimum sized compressor | $13,410 | $2,400 | n/a |
$4,224
131,887
kWh
|
$3,636
-
kW-mo/yr
|
$550 | - | - | - | - | - | $5,000 | - |
TOTAL RECOMMENDED | $277,779 | $145,564 |
$31,839
697,244
kWh
|
$8,472
-
kW-mo/yr
|
$2,822 |
$49,165
-
MMBtu
|
$(-5,108.0)
-
MMBtu
|
$62,862
-
lb
|
$80,627 | $6,100 | $5,000 | $36,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | LPG Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs