ITAC Assessment: GT0653
ITAC logo
ITAC Assessment: GT0653
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Automobile Parts
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 74,500
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 5,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,166 2,103,165
kWh
Electricity Demand $78,951 4,737
kW-mo/yr
Electricity Fees $2,196 -
Natural Gas $7,665 793
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $394,406 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $388,174

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,720 $2,000 - $4,454
-
kW-mo/yr
$266 - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,810 $600 $3,309
144,490
kWh
$5,003
-
kW-mo/yr
$498 - - - -
03 2.4221: Install compressor air intakes in coolest locations $647 $420 $362
15,826
kWh
$248
-
kW-mo/yr
$37 - - - -
04 2.7111: Reduce illumination to minimum necessary levels $384 - $139
6,155
kWh
$245
-
kW-mo/yr
- - - - -
05 3.5217: Reuse / recycle/ sell paper products $865 - - - - $960
-
lb
$(-95.0) - -
06 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $8,980 $31,660 - - - - - - $8,980
07 4.131: Modify process to reduce material use/cost $370,000 $100,000 - - - - $(-105,000.0) $475,000 -
TOTAL RECOMMENDED $394,406 $134,680 $3,810
166,471
kWh
$9,950
-
kW-mo/yr
$801 $960
-
lb
$(-105,095.0) $475,000 $8,980
TOTAL IMPLEMENTED $388,174 $132,260 $3,448
150,645
kWh
$5,248
-
kW-mo/yr
$498 - $(-105,000.0) $475,000 $8,980
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs