ITAC Assessment: GT0645
ITAC logo
ITAC Assessment: GT0645
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Bathroom Rugs
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $5
M
to 10
M
# of Employees 170
Plant Area 80,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,020 2,712,778
kWh
Electricity Demand $100,080 7,113
kW-mo/yr
Electricity Fees $22,183 -
Natural Gas $267,471 64,629
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,668 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,731

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $20,559 $10,000 $18,380
-
kW-mo/yr
- - - - $2,179
02 2.2212: Use minimum safe oven ventilation $2,720 - - $2,720
-
MMBtu
- - - -
03 2.2437: Recover waste heat from equipment $1,810 $7,000 - $1,810
-
MMBtu
- - - -
04 2.6231: Utilize controls to operate equipment only when needed $34,362 $22,000 - $34,362
-
MMBtu
- - - -
05 4.213: Purchase material from supplier in customized packaging $3,970 - - - - $1,470
-
lb
$2,500 -
06 3.4113: Treat and reuse rinse waters $25,247 $30,000 - - $13,336
-
Tgal
- - $11,911
TOTAL RECOMMENDED $88,668 $69,000 $18,380
-
kW-mo/yr
$38,892
-
MMBtu
$13,336
-
Tgal
$1,470
-
lb
$2,500 $14,090
TOTAL IMPLEMENTED $56,731 $39,000 $18,380
-
kW-mo/yr
$36,172
-
MMBtu
- - - $2,179
Yearly Savings* Imp'd Cost* Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs