| Assessment Year | 1998 |
|---|---|
| Principal Product | Bathroom Rugs |
| NAICS |
n/a
|
| SIC | 2273: Carpets and Rugs |
| Sales Range | $5 M to 10M |
| # of Employees | 170 |
| Plant Area |
80,000
ft2
|
| Annual Production | 1,500,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $64,020 | 2,712,778 |
kWh
|
$0.024 |
| Electricity Demand | $100,080 | 7,113 |
kW-mo/yr
|
$14.07 |
| Electricity Fees | $22,183 | - |
|
- |
| Natural Gas | $267,471 | 64,629 |
MMBtu
|
$4.14 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $88,668 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $56,731 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $20,559 | $10,000 |
$18,380
-
kW-mo/yr
|
- | - | - | - | $2,179 | |
| 02 | 2.2212: Use minimum safe oven ventilation | $2,720 | - | - |
$2,720
-
MMBtu
|
- | - | - | - | |
| 03 | 2.2437: Recover waste heat from equipment | $1,810 | $7,000 | - |
$1,810
-
MMBtu
|
- | - | - | - | |
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $34,362 | $22,000 | - |
$34,362
-
MMBtu
|
- | - | - | - | |
| 05 | 4.213: Purchase material from supplier in customized packaging | $3,970 | - | - | - | - |
$1,470
-
lb
|
$2,500 | - | |
| 06 | 3.4113: Treat and reuse rinse waters | $25,247 | $30,000 | - | - |
$13,336
-
Tgal
|
- | - | $11,911 | |
| TOTAL RECOMMENDED | $88,668 | $69,000 |
$18,380
-
kW-mo/yr
|
$38,892
-
MMBtu
|
$13,336
-
Tgal
|
$1,470
-
lb
|
$2,500 | $14,090 | ||
| TOTAL IMPLEMENTED | $56,731 | $39,000 |
$18,380
-
kW-mo/yr
|
$36,172
-
MMBtu
|
- | - | - | $2,179 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs