ITAC Assessment: GT0643
ITAC logo
ITAC Assessment: GT0643
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Ductile Iron Castings
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $50
M
to 100
M
# of Employees 650
Plant Area 500,000
ft2
Annual Production 100,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,887,289 159,171,163
kWh
Natural Gas $469,886 127,418
MMBtu
LPG $123,971 18,566
MMBtu
Fuel Oil #2 $20,342 3,752
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $272,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $66,000 $80,750 - - - - $66,000 -
02 2.4224: Upgrade controls on compressors $44,660 $40,000 $44,660
1,786,635
kWh
- - - - -
03 2.8113: Purchase gas directly from a contract gas supplier $33,270 - - - - - $33,270 -
04 2.2414: Use waste heat from hot flue gases to preheat $13,572 $12,000 $3,491
139,508
kWh
$10,081
-
MMBtu
- - - -
05 2.2414: Use waste heat from hot flue gases to preheat $37,500 $28,000 - $37,500
-
MMBtu
- - - -
06 2.1332: Convert combustion equipment to burn natural gas $36,165 $36,600 - $(-35,150.0)
-
MMBtu
$71,315
-
MMBtu
- - -
07 3.4155: Meter waste water $32,250 $7,000 - - - - $32,250 -
08 3.4141: Replace the chlorination stage with an oxygen or ozone stage $8,850 $36,000 - - - $3,000
-
Tgal
- $5,850
TOTAL RECOMMENDED $272,267 $240,350 $48,151
1,926,143
kWh
$12,431
-
MMBtu
$71,315
-
MMBtu
$3,000
-
Tgal
$131,520 $5,850
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs