Assessment Year | 1998 |
---|---|
Principal Product | Ice Cream |
NAICS |
n/a
|
SIC | 2024: Ice Cream and Frozen Desserts |
Sales Range | $10 M to 50M |
# of Employees | 113 |
Plant Area |
160,000
ft2
|
Annual Production | 7,500
Tgal
|
Production Hrs. Annual | 2,625
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $348,371 | 9,072,099 |
kWh
|
$0.038 |
Electricity Demand | $121,527 | 34,722 |
kW-mo/yr
|
$3.50 |
Electricity Fees | $27,760 | - |
|
- |
Natural Gas | $72,810 | 22,690 |
MMBtu
|
$3.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $111,934 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $60,671 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $28,530 | $45,720 | - |
$28,530
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.8112: Combine utility meters | $5,560 | - | - | - | - | - | - | $5,560 | - | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $9,249 | - | - |
$6,624
-
kW-mo/yr
|
- | - | $2,625 | - | - | - | |
04 | 2.4224: Upgrade controls on compressors | $7,000 | $5,000 |
$7,000
279,894
kWh
|
- | - | - | - | - | - | - | |
05 | 2.6218: Turn off equipment when not in use | $5,590 | $200 | - | - |
$5,590
-
MMBtu
|
- | - | - | - | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $4,660 | $5,675 | - | - |
$4,660
-
MMBtu
|
- | - | - | - | - | |
07 | 3.4114: Replace city water with recycled water via cooling tower | $7,741 | $7,900 | - | - | - |
$3,286
-
Tgal
|
- | - |
$4,455
-
Tgal
|
- | |
08 | 3.4155: Meter waste water | $7,180 | $8,000 | - | - | - | - | - | $7,180 | - | - | |
09 | 3.4141: Replace the chlorination stage with an oxygen or ozone stage | $36,424 | $92,125 |
$26,955
490,035
kWh
|
- | - |
$763
-
Tgal
|
- | - |
$1,046
-
Tgal
|
$7,660 | |
TOTAL RECOMMENDED | $111,934 | $164,620 |
$33,955
769,929
kWh
|
$35,154
-
kW-mo/yr
|
$10,250
-
MMBtu
|
$4,049
-
Tgal
|
$2,625 | $12,740 |
$5,501
-
Tgal
|
$7,660 | ||
TOTAL IMPLEMENTED | $60,671 | $72,295 |
$7,000
279,894
kWh
|
$28,530
-
kW-mo/yr
|
$4,660
-
MMBtu
|
$3,286
-
Tgal
|
- | $12,740 |
$4,455
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs