ITAC Assessment: SD0043
ITAC logo
ITAC Assessment: SD0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product FINANCIAL PRINTING
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area
n/a
Annual Production 750
ton
Production Hrs. Annual 4,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $665,026 8,331,770
kWh
Natural Gas $101,135 17,288
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,619 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,761

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $2,555 $2,018 $2,555
31,946
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,208 $4,631 $3,208
40,152
kWh
- -
03 2.7229: Air condition only space necessary $4,449 $2,249 $4,449
55,686
kWh
- -
04 2.2511: Insulate bare equipment $1,869 $201 $1,869
23,447
kWh
- -
05 2.1221: Replace obsolete burners with more efficient ones $10,147 $25,740 - $10,147
-
MMBtu
-
06 3.4115: Recover and reuse cooling water $1,982 $2,900 $(-1,450.0)
(-18,171)
kWh
- $3,432
07 2.2511: Insulate bare equipment $1,319 $339 $1,319
16,413
kWh
- -
08 2.2514: Cover open tanks $1,090 $140 $1,090
13,775
kWh
- -
TOTAL RECOMMENDED $26,619 $38,218 $13,040
163,248
kWh
$10,147
-
MMBtu
$3,432
TOTAL IMPLEMENTED $19,761 $35,490 $6,182
77,374
kWh
$10,147
-
MMBtu
$3,432
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs