ITAC Assessment: GT0623
ITAC logo
ITAC Assessment: GT0623
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Packing Materials
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 30,000
ft2
Annual Production 27,000
Tgal
Production Hrs. Annual 4,250
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,517 422,919
kWh
Electricity Demand $17,202 1,129
kW-mo/yr
Electricity Fees $2,143 -
Natural Gas $36,626 5,990
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,640

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $300 $390 - - - $300
-
MMBtu
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $111 $120 $46
1,465
kWh
$51
-
kW-mo/yr
$14 - - -
03 2.4221: Install compressor air intakes in coolest locations $85 $300 $36
1,172
kWh
$45
-
kW-mo/yr
$4 - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $290 $100 $120
3,810
kWh
$154
-
kW-mo/yr
$16 - - -
05 2.7314: Reduce ventilation air $220 $1,200 - - - $220
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $429 $1,300 $171
5,275
kWh
$218
-
kW-mo/yr
$40 - - -
07 3.4116: Meter recycled water (to reduce sewer charges) $765 - - - - - - $765
08 4.423: Move product using mechanical means $4,130 $2,500 - - - - $4,130 -
TOTAL RECOMMENDED $6,330 $5,910 $373
11,722
kWh
$468
-
kW-mo/yr
$74 $520
-
MMBtu
$4,130 $765
TOTAL IMPLEMENTED $4,640 $3,800 $120
3,810
kWh
$154
-
kW-mo/yr
$16 $220
-
MMBtu
$4,130 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs