ITAC Assessment: GT0619
ITAC logo
ITAC Assessment: GT0619
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Roofing Material
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 162,000
ft2
Annual Production 12,000,000
Tgal
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,751 6,320,633
kWh
Electricity Demand $113,478 12,348
kW-mo/yr
Electricity Fees $20,873 -
Natural Gas $350,268 108,993
MMBtu
LPG $33,920 3,666
MMBtu
Fuel Oil #2 $34,313 5,324
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $192,256 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,806

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $66,400 $60,620 - $66,400
-
MMBtu
- -
02 2.2121: Increase amount of condensate returned $62,700 $18,000 - $28,570
-
MMBtu
$6,830
-
Tgal
$27,300
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $990 $500 $990
39,566
kWh
- - -
04 2.2511: Insulate bare equipment $116 $310 - $116
-
MMBtu
- -
05 2.4221: Install compressor air intakes in coolest locations $2,050 $700 $2,050
81,770
kWh
- - -
06 3.7196: Use re-usable filters $60,000 $8,000 - - - $60,000
TOTAL RECOMMENDED $192,256 $88,130 $3,040
121,336
kWh
$95,086
-
MMBtu
$6,830
-
Tgal
$87,300
TOTAL IMPLEMENTED $63,806 $18,810 $990
39,566
kWh
$28,686
-
MMBtu
$6,830
-
Tgal
$27,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings