Assessment Year | 1997 |
---|---|
Principal Product | Roofing Material |
NAICS |
n/a
|
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
162,000
ft2
|
Annual Production | 12,000,000
Tgal
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $156,751 | 6,320,633 |
kWh
|
$0.025 |
Electricity Demand | $113,478 | 12,348 |
kW-mo/yr
|
$9.19 |
Electricity Fees | $20,873 | - |
|
- |
Natural Gas | $350,268 | 108,993 |
MMBtu
|
$3.21 |
LPG | $33,920 | 3,666 |
MMBtu
|
$9.25 |
Fuel Oil #2 | $34,313 | 5,324 |
MMBtu
|
$6.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $192,256 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $63,806 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $66,400 | $60,620 | - |
$66,400
-
MMBtu
|
- | - | |
02 | 2.2121: Increase amount of condensate returned | $62,700 | $18,000 | - |
$28,570
-
MMBtu
|
$6,830
-
Tgal
|
$27,300 | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $990 | $500 |
$990
39,566
kWh
|
- | - | - | |
04 | 2.2511: Insulate bare equipment | $116 | $310 | - |
$116
-
MMBtu
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,050 | $700 |
$2,050
81,770
kWh
|
- | - | - | |
06 | 3.7196: Use re-usable filters | $60,000 | $8,000 | - | - | - | $60,000 | |
TOTAL RECOMMENDED | $192,256 | $88,130 |
$3,040
121,336
kWh
|
$95,086
-
MMBtu
|
$6,830
-
Tgal
|
$87,300 | ||
TOTAL IMPLEMENTED | $63,806 | $18,810 |
$990
39,566
kWh
|
$28,686
-
MMBtu
|
$6,830
-
Tgal
|
$27,300 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs