ITAC Assessment: GT0602
ITAC logo
ITAC Assessment: GT0602
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Landing Gears
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 80,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,656 2,892,145
kWh
Electricity Demand $7,119 3,738
kW-mo/yr
Electricity Fees $231 -
Natural Gas $115,355 19,279
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,491 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,670

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8113: Purchase gas directly from a contract gas supplier $41,960 $76,100 - - - - - $41,960 -
02 2.1113: Reduce combustion air flow to optimum $1,330 $500 - - $1,330
-
MMBtu
- - - -
03 2.4221: Install compressor air intakes in coolest locations $690 $300 $690
10,258
kWh
- - - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,980 $1,000 $4,816
70,926
kWh
$164
-
kW-mo/yr
- - - - -
05 3.2176: Increase use of automation $20,487 $8,000 $437
6,448
kWh
$50
-
kW-mo/yr
- - $20,000 - -
06 3.6114: Use precipitating agents in waste water treatment that produce the least quantity of waste $1,044 $3,500 - - - $1,800
-
Tgal
$(-270.0) - $(-486.0)
TOTAL RECOMMENDED $70,491 $89,400 $5,943
87,632
kWh
$214
-
kW-mo/yr
$1,330
-
MMBtu
$1,800
-
Tgal
$19,730 $41,960 $(-486.0)
TOTAL IMPLEMENTED $5,670 $1,300 $5,506
81,184
kWh
$164
-
kW-mo/yr
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs