Assessment Year | 1996 |
---|---|
Principal Product | Carpet |
NAICS |
n/a
|
SIC | 2273: Carpets and Rugs |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
267,000
ft2
|
Annual Production | 42,900,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $432,628 | 13,529,895 |
kWh
|
$0.032 |
Natural Gas | $931,044 | 246,288 |
MMBtu
|
$3.78 |
Fuel Oil #6 | $790,809 | 284,123 |
MMBtu
|
$2.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $646,750 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,200 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $3,850 | $38,240 |
$3,850
120,164
kWh
|
- | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,210 | $151,530 |
$29,210
912,954
kWh
|
- | - | - | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,350 | $2,210 |
$1,350
42,204
kWh
|
- | - | - | - | - | |
04 | 2.2223: Enhance sensitivity of temperature control and cutoff | $51,750 | $6,000 | - |
$50,000
-
MMBtu
|
- | - | - |
$1,750
-
Tgal
|
|
05 | 2.8113: Purchase gas directly from a contract gas supplier | $219,570 | $122,000 | - | - | - | - | $219,570 | - | |
06 | 2.4224: Upgrade controls on compressors | $4,500 | $7,000 |
$4,500
140,973
kWh
|
- | - | - | - | - | |
07 | 2.2121: Increase amount of condensate returned | $124,000 | $187,500 | - |
$94,500
-
MMBtu
|
- | - | - |
$29,500
-
Tgal
|
|
08 | 3.1191: Change procedures / equipment / operating conditions | $212,520 | $600,000 | - | - |
$143,620
-
lb
|
$68,900 | - | - | |
TOTAL RECOMMENDED | $646,750 | $1,114,480 |
$38,910
1,216,295
kWh
|
$144,500
-
MMBtu
|
$143,620
-
lb
|
$68,900 | $219,570 |
$31,250
-
Tgal
|
||
TOTAL IMPLEMENTED | $5,200 | $40,450 |
$5,200
162,368
kWh
|
- | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs