ITAC Assessment: GT0598
ITAC logo
ITAC Assessment: GT0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Carpet
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 267,000
ft2
Annual Production 42,900,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $432,628 13,529,895
kWh
Natural Gas $931,044 246,288
MMBtu
Fuel Oil #6 $790,809 284,123
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $646,750 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.4133: Use most efficient type of electric motors $3,850 $38,240 $3,850
120,164
kWh
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $29,210 $151,530 $29,210
912,954
kWh
- - - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,350 $2,210 $1,350
42,204
kWh
- - - - -
04 2.2223: Enhance sensitivity of temperature control and cutoff $51,750 $6,000 - $50,000
-
MMBtu
- - - $1,750
-
Tgal
05 2.8113: Purchase gas directly from a contract gas supplier $219,570 $122,000 - - - - $219,570 -
06 2.4224: Upgrade controls on compressors $4,500 $7,000 $4,500
140,973
kWh
- - - - -
07 2.2121: Increase amount of condensate returned $124,000 $187,500 - $94,500
-
MMBtu
- - - $29,500
-
Tgal
08 3.1191: Change procedures / equipment / operating conditions $212,520 $600,000 - - $143,620
-
lb
$68,900 - -
TOTAL RECOMMENDED $646,750 $1,114,480 $38,910
1,216,295
kWh
$144,500
-
MMBtu
$143,620
-
lb
$68,900 $219,570 $31,250
-
Tgal
TOTAL IMPLEMENTED $5,200 $40,450 $5,200
162,368
kWh
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs