ITAC Assessment: GT0571
ITAC logo
ITAC Assessment: GT0571
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Plastic Utensils
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 75
Plant Area 28,000
ft2
Annual Production 2,700,000
pieces
Production Hrs. Annual 2,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,517 207,796
kWh
Natural Gas $3,146 463
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,660 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $110 $300 $110
879
kWh
-
02 2.2437: Recover waste heat from equipment $890 $2,700 - $890
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $470 $300 $470
4,396
kWh
-
04 2.7241: Install outside air damper / economizer on hvac unit $1,620 $2,500 $1,620
15,240
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,500 $10,000 $2,500
23,154
kWh
-
06 2.7131: Add area lighting switches $70 $150 $70
586
kWh
-
TOTAL RECOMMENDED $5,660 $15,950 $4,770
44,255
kWh
$890
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs