ITAC Assessment: GT0543
ITAC logo
ITAC Assessment: GT0543
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Vegetable Oil
NAICS
n/a
SIC 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 28
Plant Area 10,000
ft2
Annual Production 55,773,983
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,121 1,900,352
kWh
Natural Gas $220,613 60,907
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,773

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $14,750 $14,450 - $14,750
-
MMBtu
02 2.2121: Increase amount of condensate returned $10,138 $3,400 - $10,138
-
MMBtu
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $2,530 $7,185 - $2,530
-
MMBtu
04 2.2449: Recover heat from exhausted steam, hot air or hot water $5,880 $8,250 - $5,880
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,940 $5,000 $1,940
37,515
kWh
-
06 2.4227: Use compressor air filters $815 $750 $815
15,826
kWh
-
TOTAL RECOMMENDED $36,053 $39,035 $2,755
53,341
kWh
$33,298
-
MMBtu
TOTAL IMPLEMENTED $18,773 $17,400 $2,755
53,341
kWh
$16,018
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs