ITAC Assessment: AT0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ORGANIC CHEMICALS
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 18,000,000
lb
Production Hrs. Annual 8,232
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,821 4,007,913
kWh
Natural Gas $1,019,804 244,108
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,621

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $871 $734 $871
20,223
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $507 $400 $507
11,723
kWh
-
03 2.2122: Install / repair insulation on condensate lines $878 $1,440 - $878
-
MMBtu
04 2.7226: Use computer programs to optimize hvac performance $3,874 $2,000 $3,874
89,977
kWh
-
05 2.1243: Use heat from boiler blowdown to preheat boiler feed water $3,900 $1,200 - $3,900
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $18,469 $75 - $18,469
-
MMBtu
07 2.2163: Use minimum steam operating pressure $1,990 - - $1,990
-
MMBtu
TOTAL RECOMMENDED $30,489 $5,849 $5,252
121,923
kWh
$25,237
-
MMBtu
TOTAL IMPLEMENTED $27,621 $4,409 $5,252
121,923
kWh
$22,369
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs