| Assessment Year | 1994 |
|---|---|
| Principal Product | Upholstery Fabric |
| NAICS |
n/a
|
| SIC | 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk |
| Sales Range | $1 M to 5M |
| # of Employees | 20 |
| Plant Area |
48,000
ft2
|
| Annual Production | 18,210,000
thousand feet
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $186,978 | 3,797,480 |
kWh
|
$0.049 |
| Natural Gas | $9,860 | 1,559 |
MMBtu
|
$6.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $95,238 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4323: Use optimum size and capacity equipment | $76,070 | $30,000 |
$2,105
42,790
kWh
|
- | $73,965 | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $350 | $1,000 |
$43
879
kWh
|
$307
-
MMBtu
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,520 | $4,420 |
$5,520
111,958
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,310 | $34,680 |
$10,310
209,261
kWh
|
- | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,108 | $2,500 |
$1,108
35,463
kWh
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,880 | $720 |
$1,880
42,790
kWh
|
- | - | |
| TOTAL RECOMMENDED | $95,238 | $73,320 |
$20,966
443,141
kWh
|
$307
-
MMBtu
|
$73,965 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs