ITAC Assessment: GT0536
ITAC logo
ITAC Assessment: GT0536
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Upholstery Fabric
NAICS
n/a
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 48,000
ft2
Annual Production 18,210,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,978 3,797,480
kWh
Natural Gas $9,860 1,559
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,238 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Product Savings
01 2.4323: Use optimum size and capacity equipment $76,070 $30,000 $2,105
42,790
kWh
- $73,965
02 2.7447: Install vinyl strip / high speed / air curtain doors $350 $1,000 $43
879
kWh
$307
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,520 $4,420 $5,520
111,958
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,310 $34,680 $10,310
209,261
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,108 $2,500 $1,108
35,463
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,880 $720 $1,880
42,790
kWh
- -
TOTAL RECOMMENDED $95,238 $73,320 $20,966
443,141
kWh
$307
-
MMBtu
$73,965
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs