ITAC Assessment: GT0524
ITAC logo
ITAC Assessment: GT0524
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Microwave Ovens
NAICS
n/a
SIC 3631: Household Cooking Equipment
Sales Range $50
M
to 100
M
# of Employees 463
Plant Area 263,000
ft2
Annual Production 475,000
pieces
Production Hrs. Annual 3,840
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $308,095 6,277,550
kWh
Natural Gas $130,372 38,121
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,452 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,680 $1,300 $1,680
34,291
kWh
-
02 2.2437: Recover waste heat from equipment $3,160 $5,030 $3,160
285,463
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,250 $8,000 $9,250
188,746
kWh
-
04 2.2612: Use cooling tower water instead of refrigeration $2,930 $5,800 $2,930
77,960
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,355 $7,813 $3,355
68,288
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,707 $51,104 $4,707
95,838
kWh
-
07 2.2414: Use waste heat from hot flue gases to preheat $4,370 $11,000 - $4,370
-
MMBtu
TOTAL RECOMMENDED $29,452 $90,047 $25,082
750,586
kWh
$4,370
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs