Assessment Year | 1993 |
---|---|
Principal Product | Tufted Carpet Yarn |
NAICS |
n/a
|
SIC | 2281: Yarn Spinning Mills |
Sales Range | $10 M to 50M |
# of Employees | 330 |
Plant Area |
200,000
ft2
|
Annual Production | 23,400,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,134,134 | 23,172,626 |
kWh
|
$0.049 |
Natural Gas | $221,160 | 95,291 |
MMBtu
|
$2.32 |
LPG | $7,895 | 2,696 |
MMBtu
|
$2.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $154,580 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,500 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $4,130 | $9,570 | - |
$4,130
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,090 | - | - |
$1,090
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $680 | $500 |
$680
13,775
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,260 | $14,500 |
$4,260
87,046
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $48,620 | $100,640 |
$48,620
994,138
kWh
|
- | |
06 | 2.2437: Recover waste heat from equipment | $45,330 | $32,700 | - |
$45,330
-
MMBtu
|
|
07 | 2.4237: Substitute compressed air cooling with water or air cooling | $8,650 | $6,560 |
$8,650
176,729
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $41,820 | $80,090 |
$41,820
855,510
kWh
|
- | |
TOTAL RECOMMENDED | $154,580 | $244,560 |
$104,030
2,127,198
kWh
|
$50,550
-
MMBtu
|
||
TOTAL IMPLEMENTED | $42,500 | $80,590 |
$42,500
869,285
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs