ITAC Assessment: GT0513
ITAC logo
ITAC Assessment: GT0513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Commercial Printing
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 50,000
ft2
Annual Production 80,000
lb
Production Hrs. Annual 4,280
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,166 689,039
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $4,070 $57,930 n/a $4,070
61,547
kWh
02 2.4133: Use most efficient type of electric motors $100 $460 n/a $100
1,758
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $40 - n/a $40
586
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $430 - n/a $430
6,448
kWh
05 2.6125: Keep equipment clean $270 $25 n/a $270
3,224
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,910 $7,770 n/a $2,910
40,739
kWh
07 2.4221: Install compressor air intakes in coolest locations $200 $100 n/a $200
2,931
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $80 $180 n/a $80
1,172
kWh
TOTAL RECOMMENDED $8,100 $66,465 $8,100
118,405
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs