ITAC Assessment: GT0511
ITAC logo
ITAC Assessment: GT0511
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product VSAT Equipment
NAICS
n/a
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 146,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,085 3,165,592
kWh
Natural Gas $7,626 1,065
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,040 $650 $1,040
12,603
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,540 $2,900 $1,540
18,757
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $33,500 $37,440 $33,500
453,693
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $980 $1,440 $980
12,896
kWh
05 2.8114: Change rate schedules or other changes in utility service $5,720 - $5,720
-
kWh
06 2.6231: Utilize controls to operate equipment only when needed $27,055 $45,000 $27,055
418,816
kWh
TOTAL RECOMMENDED $69,835 $87,430 $69,835
916,765
kWh
TOTAL IMPLEMENTED $36,080 $40,990 $36,080
485,053
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs