ITAC Assessment: GT0510
ITAC logo
ITAC Assessment: GT0510
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Specialty Chemicals
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 70,000
ft2
Annual Production 116,686,250
lb
Production Hrs. Annual 8,568
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $486,120 9,407,972
kWh
Natural Gas $791,775 216,332
MMBtu
Fuel Oil #2 $22,000 4,886
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $173,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $157,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,220 $9,990 $4,220
81,477
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $700 $930 $700
13,482
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,250 $500 $1,250
24,326
kWh
-
04 2.4133: Use most efficient type of electric motors $1,880 $5,260 $1,880
36,635
kWh
-
05 2.2121: Increase amount of condensate returned $10,100 $6,500 - $10,100
-
MMBtu
06 2.1223: Install smaller boiler (increase high fire duty cycle) $134,080 $250,000 - $134,080
-
MMBtu
07 2.2135: Repair and eliminate steam leaks $20,590 $2,400 - $20,590
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $740 $2,160 $740
14,361
kWh
-
TOTAL RECOMMENDED $173,560 $277,740 $8,790
170,281
kWh
$164,770
-
MMBtu
TOTAL IMPLEMENTED $157,800 $258,160 $3,130
60,961
kWh
$154,670
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs