Assessment Year | 1993 |
---|---|
Principal Product | Specialty Chemicals |
NAICS |
n/a
|
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 125 |
Plant Area |
70,000
ft2
|
Annual Production | 116,686,250
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $486,120 | 9,407,972 |
kWh
|
$0.052 |
Natural Gas | $791,775 | 216,332 |
MMBtu
|
$3.66 |
Fuel Oil #2 | $22,000 | 4,886 |
MMBtu
|
$4.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $173,560 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $157,800 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,220 | $9,990 |
$4,220
81,477
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $700 | $930 |
$700
13,482
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,250 | $500 |
$1,250
24,326
kWh
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $1,880 | $5,260 |
$1,880
36,635
kWh
|
- | |
05 | 2.2121: Increase amount of condensate returned | $10,100 | $6,500 | - |
$10,100
-
MMBtu
|
|
06 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $134,080 | $250,000 | - |
$134,080
-
MMBtu
|
|
07 | 2.2135: Repair and eliminate steam leaks | $20,590 | $2,400 | - |
$20,590
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $740 | $2,160 |
$740
14,361
kWh
|
- | |
TOTAL RECOMMENDED | $173,560 | $277,740 |
$8,790
170,281
kWh
|
$164,770
-
MMBtu
|
||
TOTAL IMPLEMENTED | $157,800 | $258,160 |
$3,130
60,961
kWh
|
$154,670
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs