Assessment Year | 1993 |
---|---|
Principal Product | Commercial Ice Machines |
NAICS |
n/a
|
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $50 M to 100M |
# of Employees | 210 |
Plant Area |
n/a
|
Annual Production | 40,000
pieces
|
Production Hrs. Annual | 1,968
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $329,607 | 3,924,092 |
kWh
|
$0.084 |
Natural Gas | $47,657 | 8,392 |
MMBtu
|
$5.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,310 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,380 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,080 | $4,175 |
$1,080
12,896
kWh
|
|
02 | 2.7134: Use photocell controls | $300 | $200 |
$300
3,517
kWh
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,210 | $640 |
$1,210
14,361
kWh
|
|
04 | 3.1191: Change procedures / equipment / operating conditions | $1,180 | $4,000 |
$1,180
14,068
kWh
|
|
05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $9,230 | $11,000 |
$9,230
476,260
kWh
|
|
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,470 | $2,480 |
$1,470
67,702
kWh
|
|
07 | 2.3212: Optimize plant power factor | $18,870 | $34,800 |
$18,870
132,474
kWh
|
|
08 | 2.4133: Use most efficient type of electric motors | $520 | $3,310 |
$520
6,155
kWh
|
|
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $230 | - |
$230
2,638
kWh
|
|
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,220 | $500 |
$1,220
14,654
kWh
|
|
TOTAL RECOMMENDED | $35,310 | $61,105 |
$35,310
744,725
kWh
|
||
TOTAL IMPLEMENTED | $24,380 | $42,795 |
$24,380
248,242
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs