| Assessment Year | 1993 |
|---|---|
| Principal Product | Commercial Ice Machines |
| NAICS |
n/a
|
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 210 |
| Plant Area |
n/a
|
| Annual Production | 40,000
pieces
|
| Production Hrs. Annual | 1,968
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $329,607 | 3,924,092 |
kWh
|
$0.084 |
| Natural Gas | $47,657 | 8,392 |
MMBtu
|
$5.68 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $35,310 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,380 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,080 | $4,175 |
$1,080
12,896
kWh
|
|
| 02 | 2.7134: Use photocell controls | $300 | $200 |
$300
3,517
kWh
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,210 | $640 |
$1,210
14,361
kWh
|
|
| 04 | 3.1191: Change procedures / equipment / operating conditions | $1,180 | $4,000 |
$1,180
14,068
kWh
|
|
| 05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $9,230 | $11,000 |
$9,230
476,260
kWh
|
|
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,470 | $2,480 |
$1,470
67,702
kWh
|
|
| 07 | 2.3212: Optimize plant power factor | $18,870 | $34,800 |
$18,870
132,474
kWh
|
|
| 08 | 2.4133: Use most efficient type of electric motors | $520 | $3,310 |
$520
6,155
kWh
|
|
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $230 | - |
$230
2,638
kWh
|
|
| 10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,220 | $500 |
$1,220
14,654
kWh
|
|
| TOTAL RECOMMENDED | $35,310 | $61,105 |
$35,310
744,725
kWh
|
||
| TOTAL IMPLEMENTED | $24,380 | $42,795 |
$24,380
248,242
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs