ITAC Assessment: GT0503
ITAC logo
ITAC Assessment: GT0503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Cotton Cloth
NAICS
n/a
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 180,000
ft2
Annual Production 81,000,000
thousand feet
Production Hrs. Annual 8,600
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,259,350 35,894,491
kWh
Natural Gas $123,963 40,785
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $39,070 $144,720 $39,070
1,113,130
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,830 $51,700 $8,830
251,465
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,260 - $3,260
92,907
kWh
-
04 2.6231: Utilize controls to operate equipment only when needed $8,700 $3,090 $8,700
247,948
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $780 $450 - $780
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,340 - - $1,340
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $23,350 $76,040 $23,350
665,299
kWh
-
TOTAL RECOMMENDED $85,330 $276,000 $83,210
2,370,749
kWh
$2,120
-
MMBtu
TOTAL IMPLEMENTED $9,480 $3,540 $8,700
247,948
kWh
$780
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs