| Assessment Year | 1992 |
|---|---|
| Principal Product | LATEX GLOVES |
| NAICS |
n/a
|
| SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 860,000,000
pieces
|
| Production Hrs. Annual | 8,616
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $358,987 | 7,886,870 |
kWh
|
$0.046 |
| Natural Gas | $801,680 | 228,077 |
MMBtu
|
$3.51 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $137,914 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,282 | $18,910 |
$5,801
127,491
kWh
|
- | $(-519.0) | |
| 02 | 2.7261: Install timers and/or thermostats | $2,180 | $1,480 |
$2,180
48,066
kWh
|
- | - | |
| 03 | 2.2511: Insulate bare equipment | $16,146 | $20,488 | - |
$16,146
-
MMBtu
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $1,378 | $28,850 |
$1,378
30,188
kWh
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,086 | $450 |
$6,086
133,646
kWh
|
- | - | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $17,000 | $450 | - |
$17,450
-
MMBtu
|
$(-450.0) | |
| 07 | 2.2121: Increase amount of condensate returned | $1,392 | $1,250 | - |
$1,392
-
MMBtu
|
- | |
| 08 | 2.2414: Use waste heat from hot flue gases to preheat | $88,450 | $133,000 | - |
$88,450
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $137,914 | $204,878 |
$15,445
339,391
kWh
|
$123,438
-
MMBtu
|
$(-969.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs