Assessment Year | 1996 |
---|---|
Principal Product | Piping and pressure vessel connections |
NAICS |
n/a
|
SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 190 |
Plant Area |
100,000
ft2
|
Annual Production | 1,700,000
pieces
|
Production Hrs. Annual | 4,536
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $175,091 | 3,427,315 |
kWh
|
$0.051 |
Electricity Demand | $84,293 | 28,952 |
kW-mo/yr
|
$2.91 |
Electricity Fees | $2,452 | - |
|
- |
Natural Gas | $104,998 | 20,011 |
MMBtu
|
$5.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $91,932 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $91,932 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $68,000 | $61,000 | - |
$68,000
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,000 | $1,000 |
$13,000
259,965
kWh
|
- | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $509 | $1,920 |
$414
6,741
kWh
|
$95
-
kW-mo/yr
|
- | - | |
04 | 2.3212: Optimize plant power factor | $5,333 | $8,700 | - |
$5,333
-
kW-mo/yr
|
- | - | |
05 | 2.4314: Use synthetic lubricant | $1,840 | - |
$1,440
31,653
kWh
|
$400
-
kW-mo/yr
|
- | - | |
06 | 2.2511: Insulate bare equipment | $2,050 | $270 | - | - |
$2,050
-
MMBtu
|
- | |
07 | 3.7198: Reduce / eliminate use of disposable product | $1,200 | $110 | - | - | - |
$1,200
-
lb
|
|
TOTAL RECOMMENDED | $91,932 | $73,000 |
$14,854
298,359
kWh
|
$73,828
-
kW-mo/yr
|
$2,050
-
MMBtu
|
$1,200
-
lb
|
||
TOTAL IMPLEMENTED | $91,932 | $73,000 |
$14,854
298,359
kWh
|
$73,828
-
kW-mo/yr
|
$2,050
-
MMBtu
|
$1,200
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs