ITAC Assessment: GT0469
ITAC logo
ITAC Assessment: GT0469
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product DYED CARPETS
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $100
M
to 500
M
# of Employees 130
Plant Area
n/a
Annual Production 108,000
thousand feet
Production Hrs. Annual 5,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $388,700 10,224,795
kWh
Natural Gas $506,949 141,733
MMBtu
Fuel Oil #6 $395,256 183,716
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,238 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $46,283 $1,000 - $26,573
-
MMBtu
$20,710
-
MMBtu
$(-1,000.0)
02 2.1233: Analyze flue gas for proper air/fuel ratio $5,240 $10,000 - $2,945
-
MMBtu
$2,295
-
MMBtu
-
03 2.2414: Use waste heat from hot flue gases to preheat $22,360 $33,000 - $12,566
-
MMBtu
$9,794
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $565 $1,160 - $318
-
MMBtu
$247
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $250 - $250
6,448
kWh
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $14,501 $81,480 $14,501
381,594
kWh
- - -
07 2.7447: Install vinyl strip / high speed / air curtain doors $2,120 $4,800 - $2,120
-
MMBtu
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $562 $10,850 $562
14,654
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $677 $4,920 $778
20,516
kWh
- - $(-101.0)
10 2.7111: Reduce illumination to minimum necessary levels $680 $660 $680
17,878
kWh
- - -
TOTAL RECOMMENDED $93,238 $147,870 $16,771
441,090
kWh
$44,522
-
MMBtu
$33,046
-
MMBtu
$(-1,101.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs