ITAC Assessment: GT0467
ITAC logo
ITAC Assessment: GT0467
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product RECREATIONAL GAME TABLES
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,500
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,561 283,118
kWh
Natural Gas $3,900 641
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,175 $4,000 $4,175
48,066
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $239 $1,166 $239
2,638
kWh
03 2.6232: Install set-back timers $60 $140 $60
586
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $120 $150 $120
1,465
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $30 - $30
293
kWh
06 2.4231: Reduce the pressure of compressed air to the minimum required $346 - $346
4,103
kWh
TOTAL RECOMMENDED $4,970 $5,456 $4,970
57,151
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs