ITAC Assessment: GT0466
ITAC logo
ITAC Assessment: GT0466
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ENVELOPES
NAICS
n/a
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 1,900,000,000
pieces
Production Hrs. Annual 6,024
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,961 4,783,118
kWh
Natural Gas $19,394 3,441
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,501 $21,760 $7,328
122,216
kWh
- $(-827.0)
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $848 $100 $848
14,068
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $781 $520 $781
12,896
kWh
- -
04 2.4133: Use most efficient type of electric motors $901 $17,880 $901
14,947
kWh
- -
05 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $9,503 $50,000 - $9,503
-
MMBtu
-
TOTAL RECOMMENDED $18,534 $90,260 $9,858
164,127
kWh
$9,503
-
MMBtu
$(-827.0)
TOTAL IMPLEMENTED - - - - -