ITAC Assessment: GT0463
ITAC logo
ITAC Assessment: GT0463
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FIBERGLASS INSULATION
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 46,250
ton
Production Hrs. Annual 8,400
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,010,736 48,117,527
kWh
Natural Gas $1,905,291 904,181
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $173,984 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $173,984

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $6,813 $104,880 $6,813
95,252
kWh
- -
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $7,700 $2,000 $7,700
184,642
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,371 $7,200 $1,470
35,170
kWh
- $(-99.0)
04 2.6232: Install set-back timers $500 $400 $500
12,016
kWh
- -
05 2.5123: Reduce fluid flow rates $16,100 - - $16,100
-
MMBtu
-
06 2.4239: Eliminate or reduce compressed air usage $141,500 $86,000 $141,500
3,378,077
kWh
- -
TOTAL RECOMMENDED $173,984 $200,480 $157,983
3,705,157
kWh
$16,100
-
MMBtu
$(-99.0)
TOTAL IMPLEMENTED $173,984 $200,480 $157,983
3,705,157
kWh
$16,100
-
MMBtu
$(-99.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs