ITAC Assessment: GT0462
ITAC logo
ITAC Assessment: GT0462
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PRINTING INKS/VARNISHES
NAICS
n/a
SIC 2893: Printing Ink
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area
n/a
Annual Production 13,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,128 1,171,747
kWh
Natural Gas $20,772 3,657
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,688 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $258 $2,480 $315
3,810
kWh
$(-57.0)
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,831 $300 $3,831
43,962
kWh
-
03 2.4133: Use most efficient type of electric motors $240 $770 $240
2,638
kWh
-
04 2.4131: Size electric motors for peak operating efficiency $509 $2,358 $509
5,862
kWh
-
05 2.6232: Install set-back timers $850 $300 $850
9,672
kWh
-
TOTAL RECOMMENDED $5,688 $6,208 $5,745
65,944
kWh
$(-57.0)
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs