ITAC Assessment: GT0455
ITAC logo
ITAC Assessment: GT0455
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product TRUCK BODIES
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range n/a
# of Employees 38
Plant Area
n/a
Annual Production 255
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,488 426,729
kWh
Natural Gas $14,856 2,356
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,235 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $77 - $168
1,465
kWh
- $(-91.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $139 $417 $139
1,172
kWh
- -
03 2.2437: Recover waste heat from equipment $1,230 $2,625 - $1,230
-
MMBtu
-
04 2.7229: Air condition only space necessary $1,540 $930 - $1,540
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $1,249 - $924
8,499
kWh
$325
-
MMBtu
-
TOTAL RECOMMENDED $4,235 $3,972 $1,231
11,136
kWh
$3,095
-
MMBtu
$(-91.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs