ITAC Assessment: GT0452
ITAC logo
ITAC Assessment: GT0452
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SLACKS AND SHORTS
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 440,000
pieces
Production Hrs. Annual 1,960
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,330 558,910
kWh
Natural Gas $17,170 3,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,032 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $2,738 $3,500 - $2,738
-
MMBtu
02 2.2135: Repair and eliminate steam leaks $1,080 $250 - $1,080
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $36 $72 - $36
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,491 $6,180 $2,491
27,257
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $830 $125 $830
9,086
kWh
-
06 2.7245: Use direct air supply to exhaust hoods $2,862 $2,400 $2,477
26,964
kWh
$385
-
MMBtu
07 2.7446: Utilize sensors controlling roof and wall openings $30 $57 $30
293
kWh
-
08 2.7123: Keep lamps and reflectors clean $965 $2,160 $965
10,551
kWh
-
TOTAL RECOMMENDED $11,032 $14,744 $6,793
74,151
kWh
$4,239
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs