ITAC Assessment: GT0448
ITAC logo
ITAC Assessment: GT0448
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product HARDWOOD PLYWOOD
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 168
Plant Area
n/a
Annual Production 75,000
thousand feet
Production Hrs. Annual 1,960
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,555 2,827,374
kWh
Natural Gas $37,309 6,951
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $377 $120 $377
4,689
kWh
02 2.4131: Size electric motors for peak operating efficiency $1,180 $2,870 $1,180
14,654
kWh
03 2.4133: Use most efficient type of electric motors $913 $6,780 $913
11,430
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $884 $100 $884
11,137
kWh
05 2.4221: Install compressor air intakes in coolest locations $799 $500 $799
9,965
kWh
TOTAL RECOMMENDED $4,153 $10,370 $4,153
51,875
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs