| Assessment Year | 1991 |
|---|---|
| Principal Product | TOOLS AND DIES |
| NAICS |
n/a
|
| SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
| Sales Range | $5 M to 10M |
| # of Employees | 125 |
| Plant Area |
n/a
|
| Annual Production | 2,565
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $135,025 | 1,497,948 |
kWh
|
$0.090 |
| Natural Gas | $11,613 | 1,744 |
MMBtu
|
$6.66 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $37,172 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $37,172 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $945 | $500 |
$945
10,551
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,354 | $795 |
$6,354
70,633
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,910 | $17,250 |
$7,910
87,925
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $3,743 | $2,160 | - |
$3,743
-
MMBtu
|
|
| 05 | 2.7261: Install timers and/or thermostats | $1,210 | $650 | - |
$1,210
-
MMBtu
|
|
| 06 | 2.4133: Use most efficient type of electric motors | $532 | $593 |
$532
5,862
kWh
|
- | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $898 | - |
$898
9,965
kWh
|
- | |
| 08 | 2.8114: Change rate schedules or other changes in utility service | $15,580 | $70,000 |
$15,580
-
kWh
|
- | |
| TOTAL RECOMMENDED | $37,172 | $91,948 |
$32,219
184,936
kWh
|
$4,953
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $37,172 | $91,948 |
$32,219
184,936
kWh
|
$4,953
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs