ITAC Assessment: GT0435
ITAC logo
ITAC Assessment: GT0435
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BABY PRODUCTS
NAICS
n/a
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 315
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,704 2,501,465
kWh
Natural Gas $12,732 2,620
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,916 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,916

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,661 $1,197 $3,661
48,945
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $443 $600 $443
5,862
kWh
-
03 2.7261: Install timers and/or thermostats $5,660 - - $5,660
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $467 $260 $467
6,155
kWh
-
05 2.4133: Use most efficient type of electric motors $263 $557 $263
3,517
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $336 - $336
4,396
kWh
-
07 2.3191: Use demand controller or load shedder $11,086 $14,800 $11,086
-
kWh
-
TOTAL RECOMMENDED $21,916 $17,414 $16,256
68,875
kWh
$5,660
-
MMBtu
TOTAL IMPLEMENTED $21,916 $17,414 $16,256
68,875
kWh
$5,660
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs