Assessment Year | 1991 |
---|---|
Principal Product | METAL HOSES |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 80 |
Plant Area |
n/a
|
Annual Production | 2,808
thousand feet
|
Production Hrs. Annual | 2,384
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $51,186 | 637,456 |
kWh
|
$0.080 |
Natural Gas | $9,156 | 1,174 |
MMBtu
|
$7.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,309 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,719 | $7,993 |
$3,719
46,307
kWh
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $115 | $443 |
$115
1,465
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $610 | $150 |
$610
7,620
kWh
|
- | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $265 | $1,200 | - |
$265
-
MMBtu
|
|
05 | 2.7261: Install timers and/or thermostats | $1,830 | $1,500 | - |
$1,830
-
MMBtu
|
|
06 | 2.7243: Improve air circulation with destratification fans / other methods | $2,770 | $2,970 |
$(-120.0)
(-1,465)
kWh
|
$2,890
-
MMBtu
|
|
TOTAL RECOMMENDED | $9,309 | $14,256 |
$4,324
53,927
kWh
|
$4,985
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs