| Assessment Year | 1991 |
|---|---|
| Principal Product | METAL HOSES |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 80 |
| Plant Area |
n/a
|
| Annual Production | 2,808
thousand feet
|
| Production Hrs. Annual | 2,384
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $51,186 | 637,456 |
kWh
|
$0.080 |
| Natural Gas | $9,156 | 1,174 |
MMBtu
|
$7.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,309 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,719 | $7,993 |
$3,719
46,307
kWh
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $115 | $443 |
$115
1,465
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $610 | $150 |
$610
7,620
kWh
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $265 | $1,200 | - |
$265
-
MMBtu
|
|
| 05 | 2.7261: Install timers and/or thermostats | $1,830 | $1,500 | - |
$1,830
-
MMBtu
|
|
| 06 | 2.7243: Improve air circulation with destratification fans / other methods | $2,770 | $2,970 |
$(-120.0)
(-1,465)
kWh
|
$2,890
-
MMBtu
|
|
| TOTAL RECOMMENDED | $9,309 | $14,256 |
$4,324
53,927
kWh
|
$4,985
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs