ITAC Assessment: GT0431
ITAC logo
ITAC Assessment: GT0431
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product GRADUATION CAPS & GOWNS
NAICS
n/a
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 218
Plant Area
n/a
Annual Production 1,400,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,372 2,597,890
kWh
Natural Gas $4,045 1,753
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,108 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,108

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,660 $2,037 $23,660
376,319
kWh
-
02 2.6232: Install set-back timers $1,390 $1,365 $1,390
21,981
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $530 $1,840 $530
8,499
kWh
-
04 2.4133: Use most efficient type of electric motors $2,609 $9,880 $2,609
41,325
kWh
-
05 2.2135: Repair and eliminate steam leaks $696 $200 - $696
-
MMBtu
06 2.2122: Install / repair insulation on condensate lines $223 $400 - $223
-
MMBtu
TOTAL RECOMMENDED $29,108 $15,722 $28,189
448,124
kWh
$919
-
MMBtu
TOTAL IMPLEMENTED $29,108 $15,722 $28,189
448,124
kWh
$919
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs