Assessment Year | 1991 |
---|---|
Principal Product | DECORATIVE METAL TRIM |
NAICS |
n/a
|
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $1 M to 5M |
# of Employees | 20 |
Plant Area |
n/a
|
Annual Production | 1,560,000
pieces
|
Production Hrs. Annual | 3,060
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,001 | 655,920 |
kWh
|
$0.10 |
Natural Gas | $47,258 | 8,821 |
MMBtu
|
$5.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,251 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,644 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,559 | $300 | - |
$3,559
-
MMBtu
|
|
02 | 2.1232: Keep boiler tubes clean | $257 | $200 | - |
$257
-
MMBtu
|
|
03 | 2.2444: Use hot process fluids to preheat incoming process fluids | $1,520 | $500 | - |
$1,520
-
MMBtu
|
|
04 | 2.7261: Install timers and/or thermostats | $270 | - |
$270
2,638
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $328 | $133 |
$328
3,224
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $87 | $141 |
$87
879
kWh
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $419 | $358 |
$419
4,103
kWh
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $480 | - |
$480
4,689
kWh
|
- | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,331 | - |
$2,331
22,860
kWh
|
- | |
TOTAL RECOMMENDED | $9,251 | $1,632 |
$3,915
38,393
kWh
|
$5,336
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,644 | $991 |
$3,828
37,514
kWh
|
$3,816
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs