ITAC Assessment: GT0425
ITAC logo
ITAC Assessment: GT0425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CELLULAR PHONES
NAICS
n/a
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $100
M
to 500
M
# of Employees 380
Plant Area
n/a
Annual Production 190,000
pieces
Production Hrs. Annual 6,266
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $251,894 4,014,068
kWh
Natural Gas $19,470 3,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $178,583 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,177

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.6232: Install set-back timers $230 $630 $230
3,810
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $41,461 $49,722 $41,461
660,610
kWh
- -
03 2.3191: Use demand controller or load shedder $16,080 $34,000 $16,080
-
kWh
- -
04 2.4133: Use most efficient type of electric motors $568 $302 $568
9,086
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,068 - $1,068
14,947
kWh
- -
06 2.3192: Use fossil fuel powered generator during peak demand periods $110,936 $250,000 $118,806
108,734
kWh
- $(-7,870.0)
-
MMBtu
07 2.2437: Recover waste heat from equipment $8,240 $10,200 - $8,240
-
MMBtu
-
TOTAL RECOMMENDED $178,583 $344,854 $178,213
797,187
kWh
$8,240
-
MMBtu
$(-7,870.0)
-
MMBtu
TOTAL IMPLEMENTED $59,177 $84,024 $59,177
684,643
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs