ITAC Assessment: GT0421
ITAC logo
ITAC Assessment: GT0421
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product WOOD MOLDING
NAICS
n/a
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area
n/a
Annual Production 40,000
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,149 753,517
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,089 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,363

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $61 $38 $61
879
kWh
02 2.6232: Install set-back timers $129 $155 $129
2,052
kWh
03 2.4133: Use most efficient type of electric motors $482 $954 $482
7,034
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $657 - $657
9,672
kWh
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,940 $3,250 $4,940
72,685
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,820 $500 $1,820
26,671
kWh
TOTAL RECOMMENDED $8,089 $4,897 $8,089
118,993
kWh
TOTAL IMPLEMENTED $2,363 $1,492 $2,363
34,584
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs