ITAC Assessment: GT0415
ITAC logo
ITAC Assessment: GT0415
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product GOLF CLUBS
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 1,200,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,637 565,064
kWh
Natural Gas $7,998 1,145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $216 $2,220 $41
293
kWh
$175
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $1,460 - $1,460
13,775
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $410 - $410
3,810
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $627 $254 $627
5,862
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $630 $200 $630
5,862
kWh
-
06 2.7226: Use computer programs to optimize hvac performance $830 $3,650 $830
7,913
kWh
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $573 $2,400 - $573
-
MMBtu
TOTAL RECOMMENDED $4,746 $8,724 $3,998
37,515
kWh
$748
-
MMBtu
TOTAL IMPLEMENTED $2,933 $2,674 $2,758
25,792
kWh
$175
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs